Three Important Key Points of C Frame Hydraulic Press
Three key points of C frame hydraulic press Preparation work before C frame hydraulic press 1. The operator of the hydraulic press machine must be trained to master the equipment performance and operating technology before they can work independently. 2. Before operation, clean up all kinds of debris on the mold and wipe off any dirt on the hydraulic press rod. 3. The hydraulic press must be installed when the power is cut off. It is forbidden to collide with the start button, handle and pedal on the foot switch. 4. Install the upper and lower molds to center, adjust the mold gap, do not allow one side to deviate from the center, confirm that the mold is fixed and try the pressure again. 5. Before the hydraulic press works, start the equipment idling for 5 minutes. At the same time, check whether the oil level of the oil tank is sufficient, whether the sound of the oil pump is normal, whether the hydraulic unit, pipes, joints, and pistons are leaking. Advantages of C frame hydraulic